Monthly Archives: May 2009

The Rocks Are in Place

The Rocks Are in Place

 

Hard Day’s Work

Hard Day’s Work

Native Sun crew hard at work on the wall around the Tree House... almost done now.

 

Lots of Heavy Lifting

Lots of Heavy Lifting

Antonius does his share of lifting and placing the heavy rocks for the Tree House wall.

 

Building the Rock Wall

Building the Rock Wall

The Native Sun crew start work on the wall around the Tree House.

 

Pruning in the Labyrinth

Pruning in the Labyrinth

Antonius pruning in the Labyrinth.

 

Turtle Framed Up

Turtle Framed Up

 

Framing the Turtle

Framing the Turtle

Antonius cuts the casuarina wood in preparation to frame the Turtle.

 

Turtle Touch-Ups

Turtle Touch-Ups

Cleaning up the Turtle area for final touches.

 

Prepping the Amphitheatre Seating

Prepping the Amphitheatre Seating

Earthstone continue the prepping for the grass covered seating for the amphitheatre

 

Handrail and Ramp Added

Handrail and Ramp Added

Work on the treehouse continues with the addition of a handrail and ramp.